The following are attributes, we the incumbents, believe are vital in delivering sewer, water and trash services to the Moss Beach and Montara residents:
- Consistent and focused views on the stewardship of the public's assets
- Understand and be responsive to customer needs
- Continually seeking innovations and improvements to increase operational efficiencies
- Create strategic alliances and maintain strong relationships with relevant governing boards & councils
Highlight of Major Accomplished Projects (what we've already done)
- Sewer System Capital Improvement plan
- 3 Sewer main line replacement projects
- Electronic inspections of all sewer main lines
- 3 year project to clean all main lines
- Replaced emergency generator at the California Pump Station to improve reliability
- 460,000 gallon wet weather storage tank to prevent overflows during storm surges
- Odor control project at Portola pump station
- Sewer plant intertie junction improvement project
- Alta Vista Raw water line repair
- Alta Vista Water treatment plant repair
- Drilling and certification of new Alta Vista well that will add 150 gallons per minute
- Water System Master
- Implemented an appliance rebate program to assist home in reducing water consumption
- 10 Pipeline replacement projects
- Environmental Impact Report (EIR) for
-- 1 million Gallon storage tank at Alta Vista
-- New 200,000 gal tank to replace 100,000 gal. Schoolhouse tank
-- Centralized water treatment systems for all 3 airport wells
More Fixes And Repairs To Come (Continuing the Progress)
- Kanoff pump station improvement
- Vallemar pump station improvement
- Mechanical Systems Repair & Replacement
- Inflow & Infiltration testing
- Seal Cove pump controls and cabinets
- Vallemar and Date Hart pump station generators
- 7th street pump station receptacle
- California pump station wet well
- Replace check valves for 5th street pump station
- Update Date Hart pump station
- Pipe line replacements for Howells street, 7th street, Airport force main and Highway 1
- Complete feasibility evaluation to implement re-cycled water program
- Wagner well improvements to restore wells capacity to 80 gpm (gallons per minute)
- Complete regulatory requirements to bring Alta Vista, 150 gpm, well into production
- Complete design and implement treatment system to increase productivity of existing surface water sources
- Mechanical Systems Repair & Replacement
- Water meter replacement
- Water Treatment system at Airport
- Complete 2 additional test wells
- Replace outdated fire Hydrants and outdate pressure reducing valves
- Water main replacement
|